Laserfiche WebLink
<br />Describe the estimated topsoil depth and how topsoil will be salvaged. stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Ti /F SST / /r7A 7_.'_ C> 4_2 rP7-2-Y. - M OTo 2CV ND <br />GULL c, /3 CA2?_ v? /die Sot TL D ?? ??c=?C6s <br />"Z U r 2 Tv ?.o? QG r L-4s 7-z-- p, <br />4Z C 1--A M <br />s111 r uRA-?, C41V Dug Oe__Pr, . <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />5. Describe how portals, adits, shafts, ponds, excavations. or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Id- <br />Thy, >: /s /moo vltTN?2 /NT?,c ST oc2 Di i <br />ALL ??G?,ryr>7.4rr u' i[rc r ?o?iPGFTE? /N A- 77i91?L Y <br />/IIA9?/Y?.Q . ? <br />T f/Z? ruiLL B A CPAI vc. Or- N /°??S was ns /? q?>t?TLD <br />6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />IA.) 1 <br />oR 13? R ??a?ayi??? /??sTDe4 noN <br />??L (?R f6,, N41