Laserfiche WebLink
J&T Consulting, Inc. <br />GP Ranches <br />West Farm <br />3/19/21 <br />Bond Quantities and Costs <br />07115 GP Ranches Rec Bond <br />Summary of Unit Costs <br />Direct costs <br />Scarifying Ground <br />Re-applying topsoil 12" thick <br />Revegetating disturbed area <br />Dewatering full pit <br />Liner Cost - Shell zone <br />Liner Cost - Core zone <br />Mobilization <br />Liner Cost Breakdown <br />Shell zone <br />Hauling and placement of overburden <br />Blending and moisture conditioning <br />Compaction to desired density <br />QA/QC <br />Core zone <br />Ripping Clay and Shale <br />Hauling and placement of clay <br />Blending and moisture conditioning <br />Compaction to desired density <br />QA/QC <br />Overhead and Profit Costs <br />Liability insurance <br />Performance bond <br />Profit <br />Project Management <br />Engineering and bidding <br />Management and administration <br />$200 <br />$2,000.00 <br />$1,000.00 <br />$350.00 <br />$2.25 <br />$3.25 <br />$2,500 <br />$0.50 <br />$0.50 <br />$1.00 <br />$0.25 <br />Total Shell Zone Cost $2.25 <br />$1.00 <br />$0.50 <br />$0.50 <br />$1.00 <br />$0.25 <br />Total Core Zone Cost $3.25 <br />1.55% <br />1.05% <br />10.00% <br />Total Overhead Cost 12.60% <br />/ acre <br />/ acre <br />/ acre <br />/ million gallons <br />/ cubic yard <br />/ cubic yard <br />lump sum <br />/ cubic yard <br />/ cubic yard <br />/ cubic yard <br />/ cubic yard <br />/ cubic yard <br />/ cubic yard <br />/ cubic yard <br />/ cubic yard <br />/ cubic yard <br />/ cubic yard <br />/ cubic yard <br />of direct cost <br />of direct cost <br />of direct cost <br />of direct cost <br />4.25% of direct cost <br />5.00% of direct cost <br />Total Additional Cost <br />9.25% of direct cost <br />1 of 10