My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-19_PERMIT FILE - M2008078 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008078
>
2009-03-19_PERMIT FILE - M2008078 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:34 PM
Creation date
3/23/2009 2:42:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008078
IBM Index Class Name
PERMIT FILE
Doc Date
3/19/2009
Doc Name
Adequacy Review 02 Response
From
J&T Consulting, Inc.
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J&T Consulting, Inc. GP Ranches LI <br />West Farm <br />IReclamation Bond Quantities and Costs <br />07115 GP Ranches Rec Bond <br />Phase 13 (9.41 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Mining Area <br />Liner Required to Close Phases 10,12 (Credit) - Shell (231,137) cyd $ 2.25 $ (520,057) <br />Liner Required to Close Phases 10,12 (Credit) - Core (85,650) cyd $ 3.25 $ (278,362) <br />Permanent liner- Shell 226,150 cyd $ 2.25 $ 508,838 <br />Permanent liner - Core 84,356 cyd $ 3.25 $ 274,157 <br />Topsoil Area Above Water 1.8 ac $ 2,000 $ 3,680 <br />Revegetate Area Above Water 1.8 ac $ 1,000 $ 1,840 <br />Dewatering of Full Pit 160.2 Mil. Gal. $ 350.00 $ 56,087 <br />Mobilization 1.00 Is $ 2,500 $ (2,500) <br /> Total Direct Cost $ 43,683 <br />Overhead and Profit Cost (12.60%) $ 5,504 <br />Contract Cost $ 49,188 <br />Project Management (9.25%) $ 4,041 <br />Additional Financial Warrant Required For Phase 13 $ 53,228 <br />Phase 14 (11.56 acres) <br />[Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Mining Area <br />Permanent liner - Shell 117,470 cyd $ 2.25 $ 264,308 <br />Permanent liner- Core 46,155 cyd $ 3.25 $ 150,002 <br />Liner Required to Close Phase 14 - Shell 276,457 cyd $ 2.25 $ 622,028 <br />Liner Required to Close Phase 14 - Core 108,621 cyd $ 3.25 $ 353,018 <br />Topsoil Area Above Water 4.0 ac $ 2,000 $ 7,972 <br />Revegetate Area Above Water 4.0 ac $ 1,000 $ 3,986 <br />Dewatering of Full Pit 160.2 Mil. Gal. $ 350.00 $ 56,057 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Di rect Cost $ 1,459,872 <br />Overhead and Profit Cost (12.60%) $ 183,944 <br />Contract Cost $ 1,643,816 <br />Project Management (9.25%) $ 135,038 <br />Additional Financial Warrant Required For Phase 14 $ 1,778,854 <br />8of10
The URL can be used to link to this page
Your browser does not support the video tag.