Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task no. 001 <br />Date : 0311912009 <br />User : MAC <br />Permit/job no.: M-2008-078 <br />Abbreviation :none <br />Filename : M078-001 <br />Agency or organization name Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Bond Estimate <br />Task description : Dewatering Phase 1 <br />:....: <br />. <br />............. <br />HOURLY EQUIPMENT COST <br /> <br />Description Quantity Data <br />Source <br />Pump : Submersible pump - 460v, 8 in. 1 (CRG) <br />Suction hose : NA 0 NA <br />Discharge hose : Discharge pipe - 8 in. D., 25 ft. 3 (CRG) <br />Labor : Pump operator 1 (CDOT/RSM) <br />Cost Breakdown : Job Utilization <br />Ownership cost/hour : $9.82 NA Job shiftbasis : 1 per day <br />Operating cost/hour : $11.41 100 % Horsepower : 95 <br />Operator cost/hour : $19.30 NA Weight (UST) : 0.70 <br />Total cost/hour : $40.54 <br /> Total fleet cost/hour : $40.54 <br /> <br />PUMPING QUANTITIES <br />Initial pond Conversion Final pond <br />volume : 126,200,000.00 gallons factor : 1.0000 volume : 126,200,000 gallons <br /> <br />Total pond inflow surface Unit inflow rate in Total pond inflow volume <br />area : NA s q. ft. gph/sq. ft.: NA per hour : 0.00 gph <br /> <br />Source of volume estimate :Page 2 of Reclamation Bond Quantities and Costs <br /> <br />........... ...... ........ <br /> <br />PUMPING TIME ...... <br />........ <br />Maximum pump capacity : 95 gph/pump Adjusted pumping capacity : 127,200 gph <br />Estimated suction head : 0 feet Initial unadjusted pumping time 992.14 hours <br />Estimated discharge head : 68 feet Inflow during initial pumping : 0 gallons <br />Total head : 68 feet Net unadjusted pumping time : 992.14 hours <br />CPB pump capacity : 127,200 gph/pump Altitude adjustment factor : 1.0000 (NA-electric) <br />Site altitude : 3,600 feet Pump efficiency factor : 1.0909 (55 min.1hr.) <br />Inflow as % of pond volume : NA % Total adjusted pumping time : 1,082.32 hours <br /> <br /> <br />JOB TIME AND COST %wxx <br /> Total job time : 1082.32 hours <br />Unit cost : $0.000348 per gallon Total job cost : $43,882 <br /> <br />State : Colorado <br />County : Prowers <br />Site : West Farm Pit