Laserfiche WebLink
Ill. COMMENTS-COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made during <br /> the inspection. Comments also describe any enforcement actions taken during the inspection and the <br /> facts or evidence supporting the enforcement action. <br /> This was a Partial inspection conducted by Janet Binns of Colorado Division of Reclamation, Mining <br /> and Safety. The mine is a reclaimed surface mine. The weather was mild, windy and clear. Only the <br /> Load out was inspected. The Load Out site is dry with only small patches of snow remaining. <br /> Roads: The load out access road was dry. Recent tire tracks were observed on the reclaimed area west <br /> of the gate. The ground had been soft, so the tracks did not extend far into the reclaimed load out area. <br /> Hydrologic Balance: The Load Out pond was ice covered and was not discharging. The ice level was <br /> approximately 1 foot below the decant pipe. <br /> Reclamation Success: The Division continues to retain liability bond for the Load Out . There has been <br /> no new activity at the load out. No problems noted with the load out pond or with the reclaimed load out <br /> area. Vegetation on the reclaimed load out is in good shape, still dormant, and only occasional snow <br /> patches remain <br /> 3 of 4 WHITE-File YELLOW-Operator PINK-Specialist <br />