Laserfiche WebLink
DIVISION OF RECLAMATION,,.MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado.80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />COLORADO <br />DIVISION OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />March 17, 2009 <br />Mr. Matt Collins <br />Mount Royale Ventures, LLC <br />9145 Sunshine Canyon Drive <br />Boulder, CO 80302 <br />V-1? , <br />Re: Gold Hill Mill, Technical Revision Approval; Permit No. M4994-117;; Revision No. TR-07 <br />Dear Mr. Collins: <br />On March 16, 2009 the Division of Reclamation, Mining, and Safety approved the,Technical Revision application submitted to <br />the Division on February 6, 2009 addressing the following: <br />The addition of Cross Mine (Permit'No. M 1977-410) materials to the source materials, for the Gold Hill Mill. <br />The terms of the Technical Revision No. 07 approved.by the Division are hereby incorporated into Permit No. M-1994-117. In <br />making this approval, the Division has determined that milling of Cross Mine materials at the Gold Hill Mill does not constitute <br />custom milling under the Rules and Regulations of the Colorado Mined Land Reclamation Board. The conditions of the <br />Division approval are noted below. Please note that all other provisions of Permit No. M-1994-117 remain in full force and <br />effect. <br />Stipulation No. Description <br />Collect one grab and one composite sample of tailings from milling of Cross Mine materials within the first thirty <br />days after milling commences. Notify the Division at least three working days in advance of sample collection so <br />that an audit of the sampling activities and split sampling can be conducted. Have the samples analyzed using the <br />Synthetic Precipitation:Leaching Procedure by a laboratory EPA certified in that procedure, and report the results <br />to the Division as soon as they are available, but no later than 90 days following initial milling of Cross Mine <br />materials. <br />Be advised that the only approved tailing disposal facility for the Gold Hill_ Mill is the adjacent lined tailing pond. Be advised <br />that this approval does not absolve Mount Royale Ventures from the need to obtain any other necessary Federal, State, or Local <br />approvals. In particular, section 34-32-109(6) of the Colorado Mined Land Reclamation Act makes Mount Royale Ventures <br />responsible for assuring that the milling operation complies with local land use regulations. <br />STATE OF COLORADO <br />Office of Office of <br />Mined Land Reclamation I7anvnr rranrl hinrt;- . il--- . - 1 - - _.• -