Laserfiche WebLink
J&T Consulting, Inc. GP Ranches LLC <br />MReciamati West Farm Pit <br />3 /17/2009 <br />ond Quantities and Costs tpy/wss <br />R2009 JAT Censultilm Ilne. 07115 GP Ranches Rec Bond Cal <br />Phase 15 (11.52 acres) <br />lReclamation Operation Quantity Unit Unit Cost Cost <br />Active Minina Area <br />Liner Required to Close Phase 14 (Credit) - Shell (79,221) cyd $ 2.25 $ (178,247) <br />Liner Required to Close Phase 14 (Credit) - Core (31,126) cyd $ 3.25 $ (101,160) <br />Permanent liner - Shell 142,998 cyd $ 2.25 $ 321,746 <br />Permanent liner- Core 61,052 cyd $ 3.25 $ 198,419 <br />Liner Required to Close Phase 15 - Shell 84,732 cyd $ 2.25 $ 190,648 <br />Liner Required to Close Phase 15 - Core 36,176 cyd $ 3.25 $ 117,571 <br />Topsoil Area Above Water 3.2 ac $ 2,000 $ 6,353 <br />Revegetate Area Above Water 3.2 ac $ 1,000 $ 3,176 <br />Dewatering of Full Pit 144.5 Mil. Gal. $ 200.00 $ 28,899 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 869,312 <br />Overhead and Profit Cost (12.60%) $ 109,533 <br />Contract Cost $ 978,845 <br />Project Management (9.25%) $ 80,411 <br />Additional Financial Warranty Required For Phase 15 $ 1,059,256 <br />Phase 16 (11.43 acres) <br />lReciamation Operation Quantity Unit Unit Cost Cost <br />Active Minina Area <br />Liner Required to Close Phases 14 (Credit) - Shell (117,743) cyd $ 2.25 $ (264,921) <br />Liner Required to Close Phases 14 (Credit) - Core (46,261) cyd $ 3.25 $ (150,350) <br />Permanent liner - Shell 147,695 cyd $ 2.25 $ 332,313 <br />Permanent liner - Core 62,378 cyd $ 3.25 $ 202,728 <br />Liner Required to Close Phase 16 - Shell 59,222 cyd $ 2.25 $ 133,249 <br />Liner Required to Close Phase 16 - Core 25,012 cyd $ 3.25 $ 81,289 <br />Topsoil Area Above Water 2.8 ac $ 2,000 $ 5,554 <br />Revegetate Area Above Water 2.8 ac $ 1,000 $ 2,777 <br />Dewatering of Full Pit 155.8 Mil. Gal. $ 200.00 $ 31,157 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Di rect Cost $ 376,296 <br />Overhead and Profit Cost (12.60%) $ 47,413 <br />Contract Cost $ 423,709 <br />Project Management (9.25%) $ 34,807 <br />Additional Financial Warranty Required For Phase 16 $ 458,516 <br />9of10