Laserfiche WebLink
DEPARTMENT OF NA'T'URAL RESOURCES <br />DIVISION OF WATER RESOURCES <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />? Dick Wolfe, P.E. <br />Response to Reclamation Permit Application Consideration Director <br />h 16, 2009 <br />DATE: 7?1 <br />TO: ael <br />A. Cunningham, Environmental Protection Specialist <br />CC: Division 1 Office, District 5 Water Commissioner <br />FROM: loana Comaniciu, P.E. / ?WEP <br />RE: Heintzelman Project (Pit 116), File No. M-2009-0118 /MAR 17 L, <br />Operator: Christopher L. Varra, Varra Companies, Inc., (303)-666-6657 <br />Contact: Bradford Janes, Varra Companies, Inc., (970)-353-8310 Divisim01Kectdntauu:; <br />Sec 32, Twp. 3 North, Rng. 67 West, 6th P.M., Weld County WkgandSa" <br />CONDITIONS FOR APPROVAL <br />? The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />® The proposed operation will still consume ground water by: ® evaporation, ® dust control, <br />reclamation, ® water removed in the mined product, ® processing, ® other: dewatering. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, prior to obtaining a permit, an approved water supply <br />plan or decreed plan for augmentation is required. Our records show that a well permit application and <br />associated temporary substitute water supply plan have not been submitted to the State Engineer's <br />Office. <br />® Prior to approving a well permit, the applicant must conduct a field inspection of the site and document <br />the locations of all wells within 600 feet of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or request a hearing before <br />the State Engineer. <br />? The applicant has indicated plans to use other water for purposes at the permit site. The source <br />of water for this use is to be obtained from . Applicant needs to document that this water was <br />diverted in priority under a water right decreed for such industrial use. Applicant should contact the <br />water commissioner for further information. <br />? The applicant has not identified any proposed use of water at the permit site. If water will be used for <br />any purpose at this site, the applicant will need to document that the water was obtained from a legal <br />source, or the water was diverted in priority under a water right decreed for such industrial use. <br />COMMENTS: If stormwater runoff is intercepted by this operation and is not diverted or captured in priority, it <br />must be released to the stream system within 72 hours. This may require a discharge permit from CDPHE- <br />WQCD. Otherwise, the operator will need to make replacements for evaporation. <br />6 <br />Office of the State Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 ? Phone: 303,866-3581 • Fax: 303-866-3589 <br />www.waterstate.co.us