Laserfiche WebLink
TABLE 1 <br />MONTHLY DISTRIBUTIONS OF DEPLETIONS AND REPLACEMENTS REQUIREMENTS <br />GREELEY 35TH AVE (M77-036)EAST RIGDEN (M79-097) THREE BELLS PIT (M79191)KYGER PIT (M99-088) PORT OF ENTRY PIT (M82-182)WEIZEL PIT (M86-050)SHIELDS MINE (M06-064 <br /> LAGGED REPLACEMENT <br /> INTER RETURN CITY OF <br />NOT <br />BALANCED <br /> <br />ACCRETIONS 8 <br /> <br />FARM HEADGAT <br /> <br />SUMMER <br /> <br />WINTER <br /> <br />ESTIMATED <br /> <br />ACCRETION <br /> <br />MONTHLY <br /> <br />WATER PROVIDED <br /> GREELEY 35T FLOW W OBLIGATION 08LIGATIO GREELEY TRADE VERE <br />COVERED DEPLETIONS DELIVERY ACCRETIONS RETURN RETURN EVAPORATION CREDITS FROM EXCESS BYTHECITYOF <br /> AVENUE FROM475SHARE LEASE OF 475 BYTHECITYOF EASTRIGDEN THREEBELLS PORTOF SHILEDS TOTAL MIDDLE FROM 8.5 F8.5 BOX ELDER FROM 8.5 FLOW FLOW LOSSESFROM DEWATERINGAT OR DEFICIT GREELEY <br /> PIT OF BOYD AND SHARES OF BOYD GREELEYTRADE PIT PIT KYGERPIT ENTRYPIT WEIZELPIT MINE POUDRE BOX ELDER DITCH SHARES INTO SHARES OBLIGATION OBLIGATION RECHARGE PIT ETHREE BELL AT THE <br /> RIVER LEASES <br /> DEPLETIONS FREEMAN AND FREEMAN LEASE DEPLETIONS DEPLETIONS DEPLETIONS DEPLETIONS DEPLETIONS DEPLETIONS DEPLETIONS SHARES RECHARGE FROM RECHARG AF (AF) <br /> AF A A AF AF AF AF (AF) I AF AF 13 AF <br />14 15 (16) (1 (18) 19 20 <br /> (1) 2 (3) (4) (5 6 (8 (9) (10 11) 12 8 <br />82 -0.50 -4.89 4.89 <br />NOVEMBER(08) 4.28 -5.85 10.13 0.06 6.19 1.49 3.27 12.73 1.46 35.33 -18.29 <br />70 <br />13 39,76 <br />27 <br />02 . <br />DECEMBER(08) 3.16 -379 6.95 0.03 4.54 1.10 2.52 1.86 1.45 28.45 . <br />- . <br />JANUARY(09) 2.88 -2.91 5.79 0.02 3.97 1.01 2.37 1 <br />1.00 1.40 25.56 -11.48 20.70 <br />24 <br />7 <br />FEBRUARY(09) 3.34 -227 5.61 0.03 4.16 1.13 2.68 0.29 1.33 25.23 -9.71 1 <br />. <br />MARCH(09) 4.44 -1.79 6.23 0.06 5.06 1.38 3.21 .81 126 27.01 -8.76 15.0 <br />APRIL(09) 6.71 6.71 0.09 6.97 2.03 .87 .54 121 24.71 -3.38 fi4 <br />37 0,25 2.55 -19.51 19.51 <br />MAY(09) 8.6 8.6 0.13 8.77 2.49 6.03 .66 1.20 28.28 17.53 160.00 44.11 . <br />31 <br />24 0.36 -1.04 1.85 0.00 <br />JUNE(09) 11.47 11.47 0.16 11.41 3.37 8.55 10.15 1.22 34.86 109.68 130.00 69,35 <br />36 <br />79 . <br />3421 0.41 2.36 7.21 0.00 <br />JULY(09) 12 <br />77 12.77 0.17 13.38 3.92 9.96 11.17 1.29 39.89 181.44 145,90 . 76 <br />46 0.37 1.30 1.04 0.00 <br />AUGUST(09) . <br />12 .07 12.07 0.16 13.35 3.77 9.50 12.35 1.37 40.50 <br />36 <br />04 109.27 <br />25 <br />20 131.00 <br />00 <br />80 87,37 <br />85 <br />46 . <br />52.01 0.27 A. -4.29 4.29 <br />SEPTEMBER(09) 9.03 9.03 0.11 11.00 4 <br />1 <br />2 737 13.16 1.46. . . . . <br />99 11.74 0.17 2.10 32.85 0.00 <br />OCTOBER 09 6,67 6.67 0,09 8.29 0 <br />6 5.12 1325 1.52 30.33 -11.74 <br />426 <br />26 40.00 <br />756 <br />90 72. <br />578 <br />74 201.86 43.24 2.04 9.49 78.05 <br />TOTAL 65.42 -16.61 67.32 34.71 1.11 97.09 28.69 65.45 134.97 16.17 376.19 . . , <br />(1) Total lagged mining depletions at Greeley 35th Avenue <br />(2) Winter Return Flow Obligation from the use of the 475 shares of Boyd and Freeman <br />(3) Replacement water provided by the City of Greeley Trade Lease of the 457 shares of the Boyd and Freeman <br />(4) Remaining depletions at Greeley 35th Avenue not covered bythe City of Greeley Trade Lease <br />(5) Total lagged mining depletions at East Rigden Ph <br />(6) Total lagged mining depletions at the Three Bells Pit <br />(7) Total lagged mining depletions at the Kyger Pit <br />(8) Total lagged mining depletions at Pad of Entry Pit <br />(9) Total lagged mining depletions at Weizel Pit <br />(10) Total lagged mining depletions at Shields Mine <br />(11) Total Remaining Middle Poudre Depletions (3)+(4)+(5)+(6)+(7)+(B)+(9) <br />(12) Historic accretions and depletions from 8.5 Box Elder Ditch shares. Amounts include historical return flow obligations forthe 8.5 shares. <br />(13) Volume of diversion into the recharge pit on the Three Bells Pit site. <br />(14) Lagged accretions from the 8,5 shares at the river from recharge model run in 2008-2009 <br />(15) Summer return flow obligation for the 8.5 shares <br />(16) Non-Irrigation season return flow for the 6.5 shares that will be maintained in their historic pattern by the recharge program <br />(17) Estimated evaporation from the recharge pr <br />(18) Accretion credits from dewatering at the Three Bells site <br />(19) Monthly excess or deficit at the river <br />(20) Replacement water provided by the Cry of Greeley leases <br />Greeley 35th Ave, East Rigden,Three Bells Pit, Kyger PS, Port of Entry Pit and Weizel Pit, Shields Mine monthly distribution and replacements (08.09)