Laserfiche WebLink
CIRCES Cost EstimatinaSoftware <br />DEMOLITION WORK <br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br />-Truck Dump Hopper 6600 Demo.ldisp.lappr dump - to 5 mi. 6,600.00 CF $1.0437 $6,888.49 <br />-concrete floor 18" th. x 495 sq.ft. Demo.ldisp. exs. pit, 4" th.- 50 ft. 495.00 SF $1.1173 $553.08 <br />-foundation walls 30" 7963 Demo./disp. exs. pit, 1.5x2'- 50 ft. 7,963.00 LF $10.0559 $80,075.33 <br /> <br />-Reclaim Tunnel 36" belt vibrator 12 Demo./disp. exs. pit, 1.5x3'- 50 R. 12.00 LF $15.0839 $181.01 <br /> <br />-Dump Hopper Conveyor Tunnel 10' dia. x 115 R. Rat wall, steel - 12.1' D x 20' H 115.00 LF $50.0000 $5,750.00 <br /> <br />-dump Hopper Conveyor 147 Lin. Ft. Conveyor, elevated - 8' Wx 10'H 147.00 LF $45.3900 $6,672.33 <br /> <br />-Crusher building 20160 cubic feet Demo.ldisp.lappr. dump - to 5 mi. 20,160.00 CF $1.0437 $21,041.20 <br />crusher floor 12" th. 672 sq. ft. Demo./disp. exs. pit, 12" th.-200 ft. 672.00 SF $3.3890 $2,277.39 <br /> <br />-Powerhouse (2) 2240 cubic feet Demo.ldisp.lappr. dump - to 5 mi. 2,240.00 CF $1.0437 $2,337.91 <br />-powerhouse floors 224 sq. ft. Demo.ldisp. exs. pit, 8"th.- 200 ft. 224.00 SF $2.2593 $506.09 <br /> <br />-Dust Suppression Pressure Tank Building 1344 Cubic Feet Demo.ldisp.lappr. dump - to 5 mi. 1,344.00 CF $1.0437 $1,402.75 <br />-floor of Dust suppression building 192 sq, ft. X8" th. Demo.ldisp. exs. pit, 8" th.- 200 ft. 192.00 SF $2.2593 $433.79 <br /> <br />-Dust suppression System building 672 cubic feet Demo.ldisp.lappr dump - to 5 mi. 672.00 CF $1.0437 $701.37 <br />-floor of dust suppression system building 96 Demo.1disp. exs. pit, 8"th.- 200 ft. 96.00 SF $2.2593 $216.89 <br /> <br />-Water Storage Tank 6872 Demo.ldisp.lappr. dump - to 5 mi. 6,872.00 CF $1.0437 $7,172.38 <br /> <br />-Railroad track (loop & Spur) 17424 Lin. Feet Railroad track - Ties and track 17,424.00 LF $7.5400 $131,376.96 <br />ballast included in Task 1 <br />-Loadout building 63700 cu. ft. Demo.ldisp.lappr dump - to 5 mi. 63,700.00 CF $1.0437 $66,484.33 <br />-footings of Loadout building 130 fin. ft. Demo.ldisp. exs. pit, 2x3'- 200 ft. 130.00 LF $20.3338 $2,643.39 <br /> <br />-Loadout Belt (60" W) 290 Lin. Ft. Conveyor, overland - 5'W x 6'H 290.00 LF $15.1400 $4,390.60 <br /> <br />-Raft Car positioner & hopper 82560 Demo.ldisp.lappr dump - to 5 mi. 82,560.00 CF $1.0437 $86,168.71 <br />-positioner & hpper walls 12" th. X 584 sq. ft. Demo.ldisp. exs. pit, 12"th.-200 ft. 584.00 SF $3.3890 $1,979.16 <br /> <br /> <br />-Rail Car Dump Hopper Reclaim Tunnel- Belt 60" W x 1208. L Conveyor, overland - 5'W x 6'H 120.00 LF $15.1400 $1,816.60 <br />-floor 12'th.X3360s.f. Demo.1disp. exs. pit, 12"th.-10K ft. 3,360.00 SF $3.4143 $11,471.91 <br />-24" foundation walls 24" th. X 5248 s.f. Demo./disp. exs. pit, 12" th.-10K ft. 10,496.00 SF $3.7538 $39,399.79 <br /> <br />-Dump Hopper Belt conveyor Tunnel 16 dia. 106 Lin. Ft. remove converyor tunnel 106.00 LF $240.9000 $25,535.40 <br /> <br />-belt-60"w. 60"W X 146'1 Conveyor, overland - 5'W x 6'H 146.00 LF $15.1400 $2,210.44 <br /> <br /> <br />-Radial stacker pad 12"th.X3625 s. f. Demo.ldisp. exs. pit, 4"th.- 50 ft. 3,625.00 SF $1.1173 $4,050.30 <br />-Radial stacker boom 1401. f. Conveyor, elevated- 5' W x 6'H 140.00 LF $37.8300 $5,296-20 <br /> <br />-Foglet system control building 1920 s.f. Demo.ldisp.lappr. dump - to 5 mi. 1,920.00 CF $1.0437 $2,003.92 <br /> <br />-2 office trailers 19500 cf + 7200 cf Demo.ldisp.lexcav. pit - 10K' haul 26, 700.00 CF $0.2132 $5,692.06 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST Subtotal (unadjusted): $526,730 Total Cost (adjusted for location): $486,277