Laserfiche WebLink
t <br /> <br />NOTICE OF APPEAL RIGHTS <br />Each party has the following rights: <br />1. To abide by this decision of the State Mined Land Reclamation Board. If a Petition <br />for Reconsideration or Appeal is not filed within the time limits described below, the <br />Board's decision shall be final; or <br />2. To file a Petition for Reconsideration within twenty (20) calendar days of the date the <br />Board's Order is signed (hereafter "effective date") pursuant to Rule 2.9 of the <br />Construction Rules. <br />3. To appeal this decision to the Denver District Court within thirty (30) calendar days <br />of the effective date of the Board's Order pursuant to § 24-4-106(4), C.R.S. (2008). <br />In the event the decision is appealed, pursuant to § 24-4-106(4), C.R.S. (2008), the parry <br />filing the Appeal with the Denver District Court must serve the Board with a copy of the <br />Designation of Record at: 1313 Sherman Street, Room 215, Denver, CO 80203, Attention: <br />Sitira Pope; designating the relevant parts of such record and advance the cost therefore as <br />required by § 24-4-106(6), C.R.S. (2008). Such will aide in the timely preparation of the <br />record. <br />J & D Sand and Gravel <br />Sheehan Pit <br />Reconsideration of Permit Approval <br />M-2007-058 <br />3