My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-16_PERMIT FILE - M2008085
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008085
>
2009-03-16_PERMIT FILE - M2008085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:24 PM
Creation date
3/19/2009 8:11:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008085
IBM Index Class Name
PERMIT FILE
Doc Date
3/16/2009
Doc Name
Adequacy Issue
From
DRMS
To
Asphalt Constructors, Inc.
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br /> <br />-Flatbed Truck, 4x2, 30K GVW $47.52 1 $47.52 $47.52 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $47.52 $47.52 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Alamosa <br />Transportation Cycle Time : Non- Total one-way travel distance : 30.0 miles <br /> Roadable Roadable Average travel speed : 60.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.50 0.50 Total non-roadable mob/demob cost' : $1,452.93 <br />Return time (hours) = 0.50 0.50 * two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** : $47.52 <br />Unloading time (hours) = 0.50 NA ** one round trip, no haul rig <br />Subtotals = 2.00 1.00 <br />JOB TIME AND COST Total job time : 4.00 hours <br /> Total job cost : $1,500
The URL can be used to link to this page
Your browser does not support the video tag.