My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-13_INSPECTION - M1977053
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977053
>
2009-03-13_INSPECTION - M1977053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:21 PM
Creation date
3/19/2009 8:11:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977053
IBM Index Class Name
INSPECTION
Doc Date
3/13/2009
Doc Name
Inspection report
From
DRMS
To
Asphalt Constructors, Inc.
Inspection Date
3/4/2009
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task #: 002 State :Colorado Permit/job #:M-1977-053 <br />Date : 0311312009 County :Costilla Abbreviation :none <br />User: WHE Site :Lyle Smith Pit Filename :M053-002 <br />Permit or other job action :Routine Bond Update <br />Task description :Replace topsoil 3 inch depth over 20 acres <br />HOURLY EQUIPMENT COST <br />Shift basis <br />ment Description <br />Cost Brc <br />1 per day <br />Scraper work team -Scraper :ICat 633E Series 2 (2001) <br />-Push dozer :INA <br />Support equipment -Load area : Cat D8R Series 11 - 8U (2005) <br />-Dump area : Cat D8R Series 11 - 8U (2005) <br />Road maintenance -Motor grader: NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer dozer NA NA <br />% Utilization-machine : 100 NA 50 25 NA NA <br />-Ripper attachment : NA NA 0 100 NA NA <br />Ownerhip cost/hour : $80.67 NA $50.59 $50.59 NA NA <br />Operating cost/hour : $117.98 NA $38.71 $19.36 NA NA <br />Ripper op. cost/hour : NA NA $0.00 $0.00 NA NA <br />Operator cost/hour : $24.95 NA $32.78 $32.78 NA NA <br />Unit subtotals : $223.59 NA $122.08 $102.73 NA NA <br />Number of units : 2 0 1 1 0 0 <br />Group subtotals : Work : $447.18 Support: $224.81 Maintenance : $0.00 <br />Total work team cost/hour : $671.99 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 8,067 LCY factor : NA volume : 8,067 LCY <br />Source of quantity take-off :(20ac)(43560sf/ac)(0.25D)/27 = 8,066.67 cy <br />Source of estimated swell factor : NA <br />sheet 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.