Laserfiche WebLink
\9arch 2. 2007 <br />After the pipeline was repaired and an inventory reconciliation was completed, it was determined <br />that approximately 1.100 barrels (46.200 gallons) of unleaded gasoline were released as a result of <br />this incident. <br />Geo-Con has assumed responsibility for the final cleanup of this release. Based on discussions with <br />Geo-Con's environmental consultant, E-21 Engineering, Inc. (E-21), it is likely that a combination of <br />soil excavation and air sparging/soil vapor extraction (AS/SVE) will be used to remediate the site. <br />Additional photos of the incident response, laboratory reports, and waste manifests are attached to <br />this letter. If we can provide any additional information regarding this incident. please contact us. <br />Sincerely, <br />F ONT ENV RONMENTAL INC. <br />W'6'. A <br />Paul V. Henchan. P.E. <br />Senior Consultant <br />Cc: Mr. Jim Papstein, RMPS - DuPont <br />Mr. Jeff Dann, Plains - Houston <br />Mr. Paul Gottler. E-21 Engineering - Englewood, CO <br />Attachments <br />Sparging of the Frac Tank Water