Laserfiche WebLink
Page 2 of 2 <br />slurry and backfill west of the pipeline break. This provides more <br />detail <br />than what was included in the ICAP and will serve as an addendum. <br />Based on <br />our conversation, we have verbal approval to move forward with this <br />phase of <br />work. In the event conditions are discovered that may require a change <br />in <br />plan, we will stop work and contact you immediately. <br />Thanks for your help with this matter. Please let me know if you <br />should <br />have any questions. <br />Brian N. Woody, P.G. <br />E-21 Engineering, Inc. <br />2695 South Raritan Street <br />Englewood, Colorado 80110 <br />(303) 810-1002 cell <br />(303) 991-6000 office <br />(303) 991-6001 fax <br />brianwoodyl234@msn.com <br />6/9/2007