My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-20_REVISION - M1982015 (14)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982015
>
2007-11-20_REVISION - M1982015 (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:41 PM
Creation date
3/18/2009 4:24:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
REVISION
Doc Date
11/20/2007
Doc Name
Addendum 1 to Integrated Corrective Action Plan
From
E-21 Engineering, Inc.
To
DRMS
Type & Sequence
TR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br />t <br />Cover Letter <br />' 1.0 Incorporation of CDPHE Email Comments ............................................................... .1 <br /> <br />' 2.0 <br />3.0 Emergency Response Activities (Rocky Mountain Pipeline) ..................................... <br />Water Well Search Results ....................................................................................... .1 <br />.1 <br />' <br /> <br /> <br />' 4.0 Summary of Soil Excavation and Waste Disposal Activities ..................................... <br />4.1 Slurry Wall Excavation .................................................................................. <br />4.2 Slurry Holding Trench Excavation ................................................................. <br />4.3 Petroleum Impacted Groundwater Pumping ................................................. <br />4.4 Post Excavation Slurry and Backfill Results .................................................. .2 <br />. 2 <br />.3 <br />. 5 <br />.6 <br /> <br />' <br /> <br /> <br />' 5.0 Surface Water Sampling Results ............................................................................... 6 <br />5.1 Quarry Pond #1 (Sunset Lake) ............................................................................. 7 <br />5.2 Quarry Pond #2 (Big Lake) . • 7 <br />5.3 Quarry Pond West ................................................................................................ 7 <br />5.4 St. Vrain River Sampling ...................................................................................... 7 <br /> 6.0 Quarry Pond Sparging Activities ................................................................................ 8 <br />' 7.0 Additional Site Characterization Activities .................................................................. 8 <br /> <br /> <br />' <br /> <br />8.0 7.1 New Well Installations and Sampling Activities .................................................... 8 <br />7.2 Groundwater Flow Regime and Contaminant Fate & Transport .......................... 9 <br />Air Sparge and Soil Vapor Extraction Pilot Testing ....................................................9 <br /> <br />' <br /> <br />' <br /> <br />9.0 8.1 Soil Vapor Extraction Pilot Test Results ............................................................. <br />8.2 Air-Sparge Pilot Test Results ............................................................................. <br />Additional Site Characterization and Monitoring Schedule ...................................... <br />9.1 New Wells North of the Slurry Wall .................................................................... <br />9.2 New Wells South of the Slurry Wall .................................................................... <br />9.3 Groundwater and Surface Water Monitoring Schedule ...................................... 10 <br />11 <br />11 <br />11 <br />11 <br />12 <br />10.0 Groundwater Remediation Plan .............................................................................12 <br /> LIST OF FIGURES <br />' Figure 1 - Site Map <br /> Figure 2 - Water Well Search Map <br /> Figure 3 - Soil Excavation Map <br />' Figure 4 - Slurry Wall Excavation Map <br /> Figure 5 - Slurry Holding Trench Excavation Map <br /> Figure 6 - Groundwater Laboratory Results (3/14/07) <br />' Figure 7 - Groundwater Laboratory Results (4/21/07) <br /> Figure 8 - Benzene in Groundwater and Potentiometric Surface Map (4/21/07) <br /> Figure 9 - Air-Sparge/Soil Vapor Extraction System Layout <br /> <br />D
The URL can be used to link to this page
Your browser does not support the video tag.