My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-20_REVISION - M1982015 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982015
>
2007-11-20_REVISION - M1982015 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:41 PM
Creation date
3/18/2009 4:22:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
REVISION
Doc Date
11/20/2007
Doc Name
Integrated Corrective Action Plan
From
E-21 Engineering, Inc.
To
DRMS
Type & Sequence
TR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A long, narrow (30" wide) excavation was opened for installation of the slurry <br />wall, extending approximately 350 feet to the west. The slurry wall trench <br />excavation is shored by keeping the trench completely filled with bentonite slurry <br />(drilling mud). Some gasoline flowed to the west in the excavation mixing with <br />slurry mud. A shallow trench was excavated to the east of the pipeline between <br />the quarry ponds and the St. Wain River. The slurry in the excavation west of <br />the pipeline was displaced into the trench east of the pipeline which is referred to <br />as the "Slurry Holding Trench" (SHT). The slurry wall excavation was backfilled <br />using the material excavated from the trench. <br />Current site use. <br />The site is being developed for residential home construction. The area of the <br />release is planned for recreational usage (green belt, boating, and fishing) and <br />surface water storage. <br />2
The URL can be used to link to this page
Your browser does not support the video tag.