Laserfiche WebLink
<br />TABLE 5 - WASTE CHARACTERIZATION ANALYSIS <br />BAYSHORE PIPELINE RELEASE SITE <br />FIRESTONE, COLORADO <br />E-21 PROJECT NO. 863 <br /> <br /> <br />Sample ID <br /> <br />Date Stabilized / <br /> <br />Yards of <br />Cement <br />Sample <br /> <br />Depth (ft) <br />Benzene <br /> <br />(mg/Kg) <br />Toluene <br /> <br />(mg/Kg) Ethyl- <br /> <br />Benzene <br />m /IC <br />Xylenes <br /> <br />(mg/Kg) <br />TVPH <br /> <br />(mg/Kg) <br />TCLP <br /> <br />(mg/L) <br />Slurry Holding Trench 12/19/06 NO Composite 400 620 290 1,100 15,000 12 <br />Slurry Holding Trench (22+50) 01/09/07 NO Composite 0.42 6 2.4 26 160 0.72 <br />Slurry Holding Trench (23+00) 01/09/07 NO Composite 6.5 2 19 35 670 3.5 <br />Slurry Holding Trench (22+00) 01/10/07 12 Composite 47 160 57 280 2,400 2.8 <br />Slurry Holding Trench (19+50) 01/11/07 7 Composite 8.9 31 15 61 136 NA <br />Slurry Holding Trench (19+75) 01/11/07 4 Composite 7.2 31 15 65 139 NA <br />Slurry Holding Trench (19+50 to 20+00) 01/16/07 7+2 Composite 1.7 14 3.7 42 NA NA <br />Slurry Holding Trench (22+00 to 23+00) 01/16/07 0+2 Composite 13 190 32 220 NA NA <br />Page 1 of 1