My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-20_REVISION - M1982015 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982015
>
2007-11-20_REVISION - M1982015 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:41 PM
Creation date
3/18/2009 4:22:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
REVISION
Doc Date
11/20/2007
Doc Name
Integrated Corrective Action Plan
From
E-21 Engineering, Inc.
To
DRMS
Type & Sequence
TR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. The plan should specify the actions the applicant will take to comply with the <br />corrective action or closure requirements of Sections 264/265 with a schedule of <br />implementation, including the date the ICAP becomes effective and the date a <br />completion report will be submitted. <br /> <br />Phase of Work Expected Implementation Time Elapsed <br />Since <br /> Schedule <br /> Implementation <br />Phase I - Hazardous Waste Soil <br /> <br />Excavation Feb. 5 - 9, 2007 1 week <br />Phase II - Non-Hazardous Waste <br /> <br />Soil Excavation Feb. 5 - 9, 2007 1 week <br />Slurry Wall Completion Feb. 10 - 19, 2007 2 weeks <br />Phase III - New Groundwater <br /> <br />Monitoring Well Installation Feb. 19 - 23, 2007 2.5 weeks <br />Implementation Report and <br /> <br />Groundwater Remediation Plan Feb. 28, 2007 3.5 weeks <br />24
The URL can be used to link to this page
Your browser does not support the video tag.