Laserfiche WebLink
material being generated from the West Ridge development. <br />Reclamation of the Orchard Valley West Mine fill slopes and associated disturbance was <br />completed by the fall of 1987. Slope instability necessitated the relocation of topsoil at the mine site <br />and subsequent reseeding and mulching of both the new pile and the old pile footprint was competed <br />in the fall of 1990. <br />Several small topsoil piles exist throughout the various disturbance areas on the mine. Those <br />piles project to remain undisturbed for longer than five years are seeded with the permanent seed <br />mixture. Those piles projected to be redistributed within five years are seeded with the temporary <br />seed mixture. <br />7