My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-13_REVISION - M1995063
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1995063
>
2009-03-13_REVISION - M1995063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:55:47 PM
Creation date
3/17/2009 3:56:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995063
IBM Index Class Name
REVISION
Doc Date
3/13/2009
Doc Name
Conversion Application
From
Logan County
To
DRMS
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Office Phone <br />970-522-7879 <br />Jim Neblett <br />Director-Planning & Zoning <br />FAX 970-522-4018 <br />Planning & Zoning <br />LOGAN COUNTY <br />315 MAIN STREET SUITE 2 <br />STERLING, COLORADO 80751 <br />Exhibit L <br />Reclamation Costs <br />Web: www.loganco.gov <br />The total affected area of the Schumacher Pit will be 15.98 acres. This includes the <br />current 9.98 acres and the 6 acres expansion area. The pit will be mined in 2 - 3 acre <br />sections. Reclamation costs will include: <br />Sloping: Operator and Bulldozer @ $90.00/hour x 40 hours/3 acres <br />($90.00 includes payroll and insurance for the operator and fuel cost for the <br />machine) <br />$90.00/hour x 40 hours = $3,600.00 <br />$3,600 x 5.33 (15.98 total acres _ 3 acre sections) = $19,188.00 <br />Seeding: Operator and Tractor with Seed Drill @ $60.00/hour x 4 hours/3 acres <br />($60.00 includes payroll and insurance for operator and fuel cost for the <br />machine) <br />$60.00/hour x 4 hours = $240.00 <br />$240.00 x 5.33 (15.98 total acres = 3 acre sections) = $1,279.20* <br />Seed: $100.00/50# bag 18#/acre 1.08 bags/3 acre section <br />$108.00 (1.08 x $100.00/50# bag)/3 acres <br />$108.00 x 5.33 (15.98 total acres _ 3 acres sections) = $575.64* <br />Total reclamation costs will be approximately: <br />$19,188.00 (sloping) + $1,279.20 (seeding) + $575.64 (seed) = $20,467.20 <br />* This cost may be higher if re-seeding is necessary to assure good coverage.
The URL can be used to link to this page
Your browser does not support the video tag.