My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-16_REPORT - M1997086
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1997086
>
2009-03-16_REPORT - M1997086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:22:16 AM
Creation date
3/17/2009 3:49:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997086
IBM Index Class Name
REPORT
Doc Date
3/16/2009
Doc Name
Annual Fee/Report/Map
From
Siloam Stone, Inc.
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SILOAM STONE, INC. <br />BEDROCK MINE #1 <br />M-1 997-086 <br />MARCH 13, 2009 <br />PAGE Z <br />mately 48,400 cy of topsoil saved for reclamation, located in <br />around the mined area (brown). At this time there is 8.2 acres <br />t (green) in the mine that is partially reclaimed. The field <br />stone area have been reclaimed. <br />(3) We will continue to remove stockpiled stone, in the stone <br />processing area, stone yards (purple) and on surrounding areas. <br />This year we expect to expand the slab stone mine area by 2.0 <br />ac ± adjacent to where we are mining this year. The stone yard <br />area is industrial area and would need no reclamation if mining <br />ended prematurely so. <br />(4) Reclamation is being completed as required in the permit, we <br />are within the bonded limits set in 2007. But plan to increase <br />the bonded area as soon as practical since we are so close to <br />the limit and find that we need more room. We will reclaim any <br />areas that are in their final configuration as mining pro- <br />gresses this year. Seeding will be completed on the partially <br />reclaimed area on the western edge of the northern slab stone <br />area this year. <br />(5) The current contact for this operation is: <br />Mr. Matt Mueller Phone # (719) 275-4275 <br />Siloam Stone, Inc. <br />315 N 7th St. <br />Canon City, CO 81212 <br />The effective date of all information contained herein is <br />March 11, 2009. A check for $791.00 is attached to cover the <br />annual fee for 2009 and the 2008-2009 Annual Report Map reflects <br />the areas discussed in this report. If you have any questions <br />please call me at the above phone number. <br />Respectfully Submitted, <br />Siloam Stone, Inc. <br />i <br />Matt ueller <br />enclosure <br />cc Environment, Inc. <br />file
The URL can be used to link to this page
Your browser does not support the video tag.