Laserfiche WebLink
III. COMMENTS - COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made <br /> during the inspection. Comments also describe any enforcement actions taken during the inspection <br /> and the facts or evidence supporting the enforcement action. <br /> General Comments <br /> This was an aerial inspection of the Seneca II Mine. The site was flown on the morning of 03/11/09, and Harry <br /> Ranney of the Division took 7 oblique and near vertical digital image photos. The images were viewed by Dan <br /> Mathews of the Division on 03/12/09. <br /> No problems were evident based on the photos reviewed. All areas of the mine have been reclaimed with the <br /> exception of the shop facility. The sediment ponds and remaining stock ponds and roads have been approved <br /> as permanent facilities to support the postmining land use. Full bond release has been approved for most"pre- <br /> SMCRA" reclamation, and Phase 1 bond release has been approved for the major portion of"post-SMCRA" <br /> reclamation. <br /> At the time of this inspection, there was solid snow cover throughout the mine site and adjacent areas, <br /> precluding detailed observations. <br /> 3 <br />