Laserfiche WebLink
• <br />SEDCAD 4 for Windows <br />Culvert Inputs: <br />Culvert Results: <br />Max. Tailwater Entrance <br />Length (ft) Slope (%) Manning's n Headwater (ft) Loss Coef. <br />(ft) (Ke) <br />116.00 5.00 0.0240 3.75 0.00 0.9( <br />Design Discharge = 22.74 cfs <br />Minimum pipe diameter: I - 24 inch pipe(s) required <br />Structure #57 (Riprap Chanel) <br />DSG-1A <br />Trapezoidal Riprap Channel Inputs: <br />Material: Riprap <br />Left Right <br />Bottom Freeboard Freeboard Freeboard <br />Sideslo a Sideslo a Slope <br />Width (ft) p p (%) <br />Depth (ft) % of Depth Mult. x <br />Ratio Ratio (VXD) <br />2.00 2.0:1 2.0:1 5.0 0.30 <br />Riprap Channel Results: <br /> <br />• <br />PADER Method - Steep Slope Design <br /> w/o Freeboard w/ Freeboard <br />Design Discharge: 22.74 cfs <br />Depth: 0.95 ft 1.25 ft <br />Top Width: 5.78 ft 6.98 ft <br />Velocity: 6.17 fps <br />X-Section Area: 3.68 sq ft <br />Hydraulic Radius: 0.591 ft <br />Froude Number: 1.36 <br />Manning's n: 0.0380 <br />Dmin: 2.00 in <br />D50: 3.00 in <br />Dmax: 4.50 in <br />Structure #56 LPond) <br />SG-1 <br />Pond Inputs: <br />Initial Pool Elev: 6,768.00 ft <br />Initial Pool: 0.41 ac-ft <br />*Sediment Storage: 0.02 ac-ft <br />Dead Space: 0.00% <br />46 <br />Filename: SG-1.sc4 <br />Printed 10-28-2008