Laserfiche WebLink
The proposed grading and paving of the facility site will minimize the amount of stormwater and <br />sediment from the site that now drains down the access road. Sediment entering the storm drain <br />inlet in runoff from the road and other contributing areas will be controlled by using straw bales as <br />sediment filters,. Straw bales will be staked aroutd4 fe-perimeter of the storm drain inlet as shown <br />on Drawing 2 in Appendix A. The straw bale filter will be routinely inspected and repaired as <br />needed. Accumulated sediment higher than half the depth of the bale filter will be removed. <br />• <br /> <br />OV.- <br /> <br />West Elk Mine Train Loadout Environmental Improvements p Shepherd Miller, Inc <br />p:U 1-407rcpon4eport.doc 8 July 1997 (Revised April AN)