My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-11_PERMIT FILE - C1980007A (25)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2008-12-11_PERMIT FILE - C1980007A (25)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:49 PM
Creation date
3/16/2009 3:41:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
12/11/2008
Doc Name
Surface Water Control Plan
Section_Exhibit Name
Exhibit 66 Pond MB-4
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washwater and Stormwater Management <br />The facility washwater and stormwater runoff from the paved containment area will be conveyed <br />by gravity flow to a series of stormwater management structures. These management structures are <br />shown on Drawing 1 in Appendix A and include a sediment trap, oil separator and stormwater <br />retention pond. <br />Sediment Trap <br />The sediment trap is designed to remove sediment from facility washwater and stormwater runoff <br />draining to the trap. The layout of the sediment trap and design details are shown on Drawings 1 <br />and 3 in Appendix A. Washwater will be collected and piped to the sediment trap through a trench <br />drain to be located below the loadout facility and south of the railroad track located adjacent to the <br />facility. The washwater will be conveyed from the trench drain to the sediment trap through a <br />buried pipe. (The trench drain and pipe layout are shown on Drawing 1 in Appendix A. The trench <br />drain will also function as part of the hydraulic oil spill containment system discussed later in this <br />report.) Stormwater runoff from the paved containment area upgradient of the sediment trap will be <br />directed to the sediment trap through site grading. <br />During facility washdown operations, washwater will. discharge from the sediment trap to the oil <br />separator through a pipe connecting these facilities. (The walls of the sediment trap have been <br />configured to direct any oil that may be floating on the water surface toward the inlet pipe to the <br />oil separator.) The sediment trap is designed to contain 20 cubic yards of sediment below the <br />invert of the inlet pipe to the oil separator. (Sizing calculations for the sediment trap are included <br />in Appendix C.) Approximately 20 cubic yards of sediment is currently removed quarterly from <br />the existing sediment pond <br />During larger storm events, water entering the sediment trap will also discharge through an <br />emergepW,,5pillway. The emergency spillway will be located along the northwest wall of the <br />R <br />• <br />West Elk Mine Train Loadout Environmental Improvements Shepherd Mitter, Inc. <br />pAl 1-407\reponaepon.doc 3 - July 1997 (Revised April 1998)
The URL can be used to link to this page
Your browser does not support the video tag.