Laserfiche WebLink
SEDCAD 4 for Windows <br />f nn,.rinM 1000 _9nn7 D.-1, I QMK-,.K <br />95 <br />• <br />Culvert Results: <br />Design Discharge = 14.55 cfs <br />Minimum pipe diameter: 1 - 21 inch pipe(s) required <br />Structure. #1 (Pond) <br />MB-2R <br />Pond Inputs: <br />Max. Tailwater Entrance <br />Length (ft) Slope (%) Manning's n Headwater (ft) Loss Coef. <br />(ft) (Ke) <br />42.00 5.00 0.0240 3.50 0.00 0.9( <br />Initial Pool Elev: 6,111.40 ft <br />Initial Pool: 8.01 ac-ft <br />*Sediment Storage: 0.68 ac-ft <br />Dead Space: 0.00% <br /> <br />*Sediment capacity based on A verage Annual R of 30.0 for 3 year(s) <br />Perforated Riser <br />Riser <br />Riser Height <br />Diameter Barrel <br />Barrel Barrel Slope <br />Diameter Number of <br />Spillway Elev <br />Holes per <br />Manning's n <br />(ft) <br />(in) Length (ft) (%) <br />(in) (ft) <br />Elev <br />48.00 18.00 48.00 320.00 6.25 0.0240 6,118.40 1 <br />Emeraencv Spillwa <br />Spillway Elev Crest Length Left Right Bottom <br />(ft) Sideslope Sideslope Width (ft) <br />6,119.20 12.00 1.00:1 1.00:1 8.00 <br />Pond Results: <br />Peak Elevation: 6,114.55 ft <br />H'graph Detention Time: 14.45 hrs <br />Pond Model: CSTRS <br />Dewater Time: 1.83 days <br />Trap Efficiency: 91.02% <br />Dewatenng time is calculated from peak stage to lowest spillway <br />Elevation-Capacity-Discharge Table <br />• <br />Filename: MB-2R.sc4 Printed 10-23-2008