Laserfiche WebLink
<br />b (Form 2- :Public) <br />3. De-scribe the estimated topsoil depth and how- topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />4. Describe how drill hales will be plu€ged (refer to Rule 5.4 of the Rutes for required abandonment procedures): <br />5. Describe how portals, edits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />ti. Describe how roads will be reclaimed or returizecl to their pry°°-prctspectirtg {or laetter) ccandition; <br />