My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REVISION - 3/12/2009, 2:24:46 PM-JWD
DRMS
>
Public
>
REVISION - 3/12/2009, 2:24:46 PM-JWD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:34:56 AM
Creation date
3/13/2009 10:10:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008043
IBM Index Class Name
REVISION
Doc Date
3/4/2009
Doc Name
Modification Request
From
Powertech (USA) Inc.
To
DRMS
Type & Sequence
MD2
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 (Form 2- Public) <br />5. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />An off-channel infiltration pit will be excavated using an excavator <br />an loader. Excavated-backfill material and topsoil will be separated <br />an stockpiled adjacent to the pit. Refer to Attachment C for excavated <br />........._. -------- <br />pit design and soil stockpile criteria. _.- <br />6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity -_----__...__ Average Width --- ft Average Length <br />B. Drill Holes: Quantity.- Depth (ft) Diameter <br />C. Mud Pits: Quantity -. Average Width .. _ (ft) Average length (ft) <br />Average Depth -(ft) Refer to Attachments C & D for off-channel <br />Described nfiltration it disturbance details. <br />proposed underground work, including reop ning of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />Prongsed act.iyitY_will consist of the construction of one off- <br />channel water infiltration pit for hydrogeologic investigations. <br />Soils will be stockpiled adjacent to the structure, and topsoil <br />will be stockpiled separately. Refer to Attachments C & D for _ <br />additional surface disturbance details. <br />D. Other Disturbances (please describe): <br />Additional -surface disturbance may or may not take place from heavy <br />machinery working- around the proposed site. This potential disturbance <br />- --- - ------- <br />as been compensated for by designating a 20 foot wide area that <br />encircles the entire site. Refer to Attachments C & D for surface <br />disturbance details. <br />I-- Indicate Chemicals and Fuels used or stored on site. List type; quantity and method to store. <br />None. <br />F. New Road(s): Length Width- <br />Significantly Upgraded Road(s) I_engtll ---_.- <br />00 <br />Are culverts or other crossings proposed? If so, please describe: <br />None. No new roads are planned. Access to the site will be from <br />acent existing roads. Only minor damage to existing vegetation I <br />- -------- -------- may occur during this activity. --
The URL can be used to link to this page
Your browser does not support the video tag.