Laserfiche WebLink
Exhibit E - Reclamation Plan <br />Many details were lacking in the original permit application, as originally <br />approved by the Division in 1978. This Amendment provides substantial detail of <br />features utilizing aerial photography that is ortho-rectified to approximately 1.0± <br />percent of surveyed accuracy. This highly accurate and detailed portrayal of the <br />mining and reclamation is visible under the Exhibit C - Pre-Mining and Mine Plan <br />Map; and, Exhibit F - Reclamation Plan Map. How reclamation will occur over <br />affected lands is further detailed under Exhibit L - Reclamation Costs. Exhibit L <br />also includes information on the seed mixture, reclamation costs and comportment <br />of reclamation activities over each Tract represented. <br />As extraction progresses over planned areas in Tracts A, B, and C; the completed <br />basin at Tract D will be filled proportionately, as detailed under Exhibit L - <br />Reclamation Costs. A Backfill Notice is included with this Amendment as an <br />Addendum at the back of Exhibit E - Reclamation Plan, to facilitate the fill of <br />Tract D with the use of imported inert structural fill. The upper three feet pf fill in <br />Tract D will utilize wash fines and other mine generated fill, or clean, inert fill <br />imported from sources apart from the operation. The top of the fill will be capped <br />with six (6.0±) inches of soil, as supported by Exhibit L - Reclamation Costs, and <br />related soil resources information provided in Exhibit L and Exhibit I/J - Soils and <br />Vegetation Information and related Exhibit L - Stockpile Measurements. <br />Except for historically affected lands in Tract D and C; and noting an 800± foot <br />advancing pit wall in Tract A - Active Extraction area, all resulting basin slopes <br />will be established concurrently with extraction, in conformance with Rule <br />3.1.5(7). Lands above the anticipated final water level of the basins will be graded <br />to 3H:1 V, or flatter. <br />Re-soiling will occur to the originally approved depth of six (6.0±) inches. Timing <br />and use of soil is detailed further under Exhibit I/J - Soils and Vegetation <br />Information and Exhibit L - Reclamation Costs. Where compacted lands exist, <br />and are to be revegetated, those locations will be ripped prior to re-soil application, <br />as detailed under Exhibit L - Reclamation Costs. <br />The final land configuration results in two ponds of 128.4± and 7.0± acres. The <br />balance of affected lands above the anticipated final water level will be stabilized <br />utilizing the previously approved seed mixture, as iterated under Exhibit L - <br />Addendum C: Re-vegetation Seed Mixture Costs. <br />Varra Companies, Inc. DMG Permit M78-056 2003 Amendment 1