My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-05-31_REVISION - M1978056 (8)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978056
>
2006-05-31_REVISION - M1978056 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:02:53 PM
Creation date
3/12/2009 1:22:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978056
IBM Index Class Name
REVISION
Doc Date
5/31/2006
Doc Name
Ex. L & Flood Control Plan
From
Varra Companies, Inc.
To
DMG
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DURHAM PIT (DMG NO. M-1978-056) <br /> FLOOD CONTROL MITIGATION & MINE RECLAMATION <br /> OPIINION OF PROBABLE CONSTRUCTION COSTS <br /> (LAUNCHED RIP RAP OPTION) <br /> PREPARE D FOR VARRA COMPANIES <br />ITEM UNIT ANTITY UNIT AMOUNT <br /> COST <br />RIVER BANK ARMOR EXCAVATION CU <br />YD <br /> <br />FURNISH 12"d50 RIP RAP . <br />. <br />CU <br />YD 1,050 $5.00 <br />$5,250.00 <br />INSTALL 12" d50 RIP RAP . <br />. <br />CU <br />YD 800 14.00 11,200.00 <br />FURNISH 18" d50 RIP RAP . <br />. <br />CU. YD. 800 <br />300 5.00 4,000.00 <br />INSTALL 18" d50 RIP RAP <br />CU <br />YD 18.00 5,400.00 <br />FURNISH & INSTALL TYPE 11 BEDDING MATERIAL . <br />. <br />C <br />U <br />YD 300 7.00 2,100.00 <br />FURNISH & INSTALL FILTER FABRIC . <br />. <br />S <br />Q <br />YD 150 3-? 450.00 <br />RIP RAP ARMOR EMBANKMENT . <br />. <br />CU <br />YD 750 1.50 1,125.00 <br />BERM EXCAVATION (STA. 0+00 TO 15+00) . <br />. <br />CU <br />YD 680 6'50 4,080.00 <br />CONCRETE WEIR WALL . <br />, <br />CU <br />YD 1,500 2•? 3,750.00 <br />PIT BANK BACKFILL & COMPACTION . <br />. <br />CU <br />YD 210 220.00 46,200.00 <br />BERM SHAPING & GRADING . <br />. <br />SQ <br />YD 1,500 3.00 4,500.00 <br />EROSION CONTROL BLANKET . <br />. <br />SQ <br />YD 5,100 1.50 7,650.00 <br />MUCK EXCAVATION &FOUNDATION BEDDING . <br />. Q <br />S <br />YD 5,400 1.80 9,720.00 <br />END PROTECTION 18' RIP RAP F & I . <br />, <br />CU <br />YD 150 22.00 3,300.00 <br />PLACE & REMOVE SILT FENCE L <br />F <br />. <br />. <br />L <br />F 700 25 <br />.00 1 <br />,500.00 <br /> <br />SEEDING & FERTER71LIZING . <br />. <br />. <br />ACRE 800 1 <br />.50 1 <br />1,200.00 <br /> <br />DE- WATERING FOR RIP RAP INSTALLATION <br />L <br />S 3.50 1,200.00 4,200.00 <br /> <br />ENGINEERING & QUALITY CONTROL . <br />. <br />L <br />S 1 2,500.00 2,500,00 <br /> . <br />. 1 9,000.00 9.000-99 <br />PREPARED BY: BRUCE F. <br /> <br />TOTAL ESTIMATED CONSTRUCTION COST $143,125.00 <br />PLUS 10%CONTINGENCIES 14,31250 <br />TOTAL ESTIMATED COST $157,312.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.