Laserfiche WebLink
<br />IF <br />LIST OF FIGURES AND TABLES <br />FIGURES <br />1. Locations of Exploratory Borings <br />2. Summary Logs of Exploratory Borings <br />3. Gradation Test Results <br />4. Direct Shear Test Results <br />Table I - Summary of Laboratory Test Results <br />5. River Flood and Rapid Drawdown Hydrograph <br />6. Mine Pit Rapid Drawdown Hydrograph <br />7. Stability Model <br />RIVER SIDE STABILITY <br />8. Steady State <br />9. Pseudo Static <br />10. Mine Pit Flood <br />11. Rapid Drawdown <br />MINE PIT SIDE STABILITY <br />12. Steady State <br />13. Pseudo Static <br />14. River Flood <br />15. Mine Pit Rapid Drawdown <br />PORE PRESSURE ANALYSIS <br />16. Steady State - Piezometric Surface <br />17. Steady State - Pore Pressures <br />18. River Transient Flow at Peak Flood <br />19. River Transient Pore Pressures at Peak Flood <br />20. River Transient Flow at Rapid Drawdown <br />21. River Transient Pore Pressure at Rapid Drawdown <br />22. Mine Pit Transient Flow at Peak Flood <br />23. Mine Pit Transient Pore Pressure at Peak Flood <br />24. Mine Pit Transient Flow at Rapid Drawdown <br />25. Mine Pit Transient Pore Pressure at Rapid Drawdown <br />CGRS <br />DURHAM PIT SLOPE STABILITY EVALUATION <br />CTL4T PROJECT NO. FC03 74 6-1 2 5 <br />SAPRO,IECTSWC03700 - FC037 W(M374&000 - Durham I'll SInPS St8bl lb B4lua0on1125 - Sob and Foundation Investigation - NarrRe VW0rt <br />Le0ars1FC03745.125 Transmittal IV I A10c