Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />E-21 ENGINEERING INC. S-5 <br />2695 S. RARITAN STREET BORING LOG / <br />ENGLEWOOD, COLORADO 80110 WELL COMPLETION DIAGRAM <br />PROJECT NAME: GeoCon Bayshore PROJECT NO: 863 <br />LOGGED BY: B. Woody PROJECT LOCATION: 12100 E. 1.25 Frontage Road <br />CHECKED BY: B. Woody START DATE/TIME: 8113107 @ 1300 COMPLETION DATEITIME: NA <br />GROUND SURFACE ELEVATION (FT): DRILLING COMPANY: Site Services <br />DRILLING EQUIPMENT: Track-mounted Geoprobe equipped w/6-114 in. auger OVM TYPE AND SERIAL NO: NA <br />BORING DEPTH (FT): 23' t WELL DEPTH (FT): 23' DEPTH TO WATER (INITIAL): DEPTH TO WATER (AT COMPLETION): <br />BORING DIAMETER (IN.): 8.5" WELL SCREEN INTERVAL (FT BELOW TOC): 21.23' bgs <br />WELL MATERIALS: 2" diam. Schedule 40 PVC; 0.01-inch slotted screen BACKFILL MATERIALS: Screen 10-20 clean silica sand to 20' bgs; hyd. bentonite <br />WELL CASING ELEVATON (FT): WELL COVER TYPE (FLUSH-MOUNT OR STICKUP): None <br /> <br />9L <br /> <br />C <br /> <br />w to <br />z <br />WELL I BORING <br /> LITHOLOGIC DESCRIPTION w Lu p a 0 COMPLETION COMMENTS <br />a CL Lu 06 <br />a <br />DETAILS <br />Lu <br />0 ¢ <br />fn Q <br />VJ O m o <br /> Install Sparge Well - NO SAMPLING <br />5 5 <br /> 'o <br /> u <br /> z <br /> z <br />w <br />m <br />10 10 <br />15 15 <br />20 20 i <br /> N <br /> = Q <br /> U <br />J <br /> BEDROCK <br />o <br /> BOTTOM OF BORING @ 23' SET WELL @ 1330 <br />25 25 <br />30 30