My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-11_REVISION - C1982056 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2009-03-11_REVISION - C1982056 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:18 PM
Creation date
3/12/2009 9:14:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
3/11/2009
Doc Name
Requesting Assistance for Review Memo
From
Janet Binns
To
Kent Gorham
Type & Sequence
TR66
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTEROFFICE MEMORANDUM <br />TO, KENT GO <br />FROM: JANET BINNS <br />W <br />SUBJECT: FOIDEL CRE <br />MIREVISION NO. 66 <br />DATE: 3/11/09 <br />CC: DAN HERNANDEZ <br />Twentymile Coal Company has submitted an application for a technical revision to the Foidel Creek Mine permit <br />(C1982-056). This revision proposes to drill two 6-foot diameter boreholes for installation of a ventilation fan and an <br />escape shaft. A 17 1h" pilot hole will also be drilled and cased for use as a Nitrogen injection borehole. The boreholes <br />will be blind sink drilled from the surface with cuttings placed in a lined cuttings pit with dimensions 200 ft. x 100 ft. x 10 <br />ft. An access road will be constructed from Routt County Road No. 27. The borehole pad will measure approximately <br />425 ft. x 500 ft., and a transformer ad, 80 ft. x 125 ft., and a topsoil stockpile will also be constructed. TCC anticipates <br />the total disturbed area will be 5.> acres. TCC is proposing to construct a two-celled sedimentation pond to treat <br />sediment from the disturbed area. One culvert is proposed on the 18-Left access road. <br />I am requesting your assistance with review of the sediment pond design and location for this revision for compliance <br />with Rule 4.05, and design and sizing of the road culvert. TCC conducted a soil survey of the proposed disturbance area. <br />The soils information is found in Exhibit 16G. Exhibit 8DD contains the proposed drainage and pond designs. <br />The application was found complete on March 11, 2009. Please provide your adequacy concerns to me by April 10, <br />2009. Please let me know if you have any questions or need additional materials from me. <br />Attached: <br />Exhibit 8DD <br />Exhibit 16G <br />Revised pages 2.05-45.4, 2.05-45.5, 2.05-45.6, 2.05-45.6a, 2.05-45.68, 2.05-45.6h, 2.05-45.61, 2.05-45.6), 2.05-45.7
The URL can be used to link to this page
Your browser does not support the video tag.