Laserfiche WebLink
Riverview Resource MINE RECLAMATION COSTS <br />ITEM UNIT COST PER UNIT NUMBER OF UNITS TOTAL COST <br />Direct Cost. Earthmovin and Reve etation <br />Grass Seed Mix Acre 50 <br />Drilling Grass Seed Acre 50 <br />Fertilizer-40#A N&P Acre 50 <br />Fertilizer Application Acre 50 <br />Top Soiling with Dozer/Loader Cubic Yard 80,000 <br />Disking or Scarifying Acre 50 <br />Weed Control Acre 250 <br />Back Sloping Cubic Yard 74,000 <br />Conveyor Removal Linear Foot 2,000 <br />Mobilization & Demobilization Lump Sum 1 <br /> <br />Plantings Lump Sum 1 <br />Total Direct Reclamation Cost (D.R.C.) <br /> <br />ITEM PERCENT OF D.R.C. COST <br />Indirect Cost. Overhead & Profit <br />Public Liability Insurance 1.55% <br />Contractor Performance Bond 1.55% <br />Contractor Profit 10.00% <br />DRMS Project Administration Expense 5.00% <br />Total Indirect Reclamation Cost <br />TO A ERFOR NCEliBOND? _ MOUNTA?-i" ,,,r, . <br />Per Acre Cost of Reclamation (40 acres) <br />K:\Barbb\AI\Greeley\Referral Response\DRMS response 3 10 09\Exhibit L Rec Cost Estimate for DRMS to calculate.xls 3/10/2009