My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-05_PERMIT FILE - M2008080 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008080
>
2009-03-05_PERMIT FILE - M2008080 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:07 PM
Creation date
3/11/2009 3:52:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008080
IBM Index Class Name
PERMIT FILE
Doc Date
3/5/2009
Doc Name
Adequacy Review Response
From
J&T Consulting, Inc.
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 , <br />J&T Consulting, Inc. Journey Ventures, LU <br />id I Kersey GravelF <br />314/20C <br />teclamation Bond Quantities and Costs tpyfjt <br />2009 J[!T Caoeutthm Im. 07113 Journey ventures Pit Rec Bond Calc <br />Summary of unit Costa <br />Direct costs <br />Re-applying topsoil 12 thick <br />Revegetating disturbed area <br />Dewatering full pit <br />Slurry Wall Cost (75 foot average depth) <br />(0-50 ft @ $31ft - 51-70 R @ $41ft - 71-75 ft @ $161ft) <br />Scarifying Ground <br />Mobilization <br />$1,800.00 /acre <br />$1,000.00 /acre <br />$200.00 / million gallons <br />$310.00 / linear foot <br />$200 / acre <br />$2,500 lump sum <br />Overhead and Profit Costs <br />Liability insurance 1.55% of direct cost <br />Performance bond 1.05% of direct cost <br />Profit 10.00% of direct cost <br /> Total Overhead Cost 12.60% of direct cost <br />Project Management <br />Engineering and bidding 4.25% of direct cost <br />Management and administration 5.00% of direct cost <br /> Total Additional Cost 9.25% of direct cost <br />1 of 5
The URL can be used to link to this page
Your browser does not support the video tag.