Laserfiche WebLink
-2- <br />necessary due to the current agricultural zoning at the site. After the site is mined and <br />reclaimed (to rangeland) the zoning would revert back to an agricultural designated <br />zoning. <br />Hard Rock Paving and Redi_Mix Inc. had revised the DRM&S Permit in 2003 to <br />a single 66.80 acre phase and the site is frilly bonded for reclamation. Hard. Rock has also <br />updated-the Pit Agreement with Elk Mountain to mess and operate at the site. The <br />agreement allows Elk Mountain Cattle Company to operate at the site as well. The site <br />has Previously, under past CUPS.-, Openated both aspbWt aid a r?q productim <br />operations on an as needed basis using both mobile and permanently installed process <br />'equipments. Hard Raek m a" R te. Inc CUP AttVBfttbn h a <br />T'b ---- - -.-- - -- - <br />All Propos t wvould-be arobile and-self contaimd. Thc?prapesed <br />equipment is. currcmrdy stacked for storage at the applicants Canon City ration. Copies <br />of the Relocaiion Notice Permits Ahat show the current location (in storage) for proposed <br />equipment is included in the apphc*m: J b Cmuy ve copws-ef any <br />Relocation Notices for Portable Sources Permits (ie. required by CDPHE-Air Pollution <br />Control Division). for the Asphalt Plant and other equipment as mobilized and <br />dernobilized from the site. <br />When -equipment is operating at the site, the hours of Asphalt Plant Operations <br />WOUld be b ai$ till 6-1n- Monday thmigh Enday and gay not during winter months. <br />If hmlh% from- -the site. try-haul houm Abe from-? am-thbr? 6, p Monday <br />through l+rday. The applicant would prefer and try to plan for asphalt production and <br />hauling activities to take place in as short an interval as possible owe all variables for any <br />specific project are known. <br />Lighting will not be used as all operations will be during daylight - late spring, <br />SUmmct, fail hours. Any power reed will be ftba the pl gem fbr <br />equipnient.operations- Maximum asphalt plant-noise levels oach -90-dl's and lower <br />depending on proximity/distance from certain-equipments. There are no residences or <br />other business close enough to the site to be affected. Plant noise will be mitigated by <br />equipment shielding and distance and hours of operation- The plant will to be sited <br />conveniat to active minin <br />pl a for -mom ion-to the <br />site. <br />Dust-on, the intemaL mads_ and- opeaab nal_arms _of the- site-wifl-. be controlled via <br />water spray due to the proximity of the river. Water spray (devices) will be used on all <br />crushing and material hwafer equipment and stockpiles as per CDPHE regulations. Site <br />access will be from Park County Road 59. An access has been at this location-for many