My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-13_GENERAL DOCUMENTS - M1984101 (11)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1984101
>
2009-01-13_GENERAL DOCUMENTS - M1984101 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:52 PM
Creation date
3/11/2009 9:16:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984101
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
1/13/2009
Doc Name
Referral Response- Add. E
From
Park County
To
DRMS
Permit Index Doc Type
Gen. Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MANAGEMENT APPROVAL AND REVIEW <br />In accordance with 40 CFR 112.5(b), a review and evaluation of this SPCC Plan is required at <br />least once every five years. <br />If required, as a result of the five-year review and evaluation, A & S Construction Co. will amend <br />the SPCC Plan within six months of the review to include more effective prevention and control <br />technology if: (1) such technology will significantly reduce the likelihood of a spill event from the <br />facility; and (2) if such technology has been field-proven at the time of review. A Professional <br />Engineer shall certify any technical amendment to the SPCC Plan. <br />"I have completed review and evaluation of the SPCC Plan for Crusher #3 and will/will not <br />amend the Plan as a result:" <br />Review Date Signature Amendment Type PE Certified? (Y/N, <br />(None, Admin, Date) <br />Technical) <br />MANAGEMENT APPROVAL <br />A & S Construction Co. is committed to the prevention of discharges of oil to navigable waters <br />and the environment, and will maintain the highest standards for spill prevention control and <br />countermeasures through regular review, updating, and implementation of this Spill Prevention <br />Control and Countermeasure Plan for Crusher #3. <br />Authorizec <br />Signature: <br />Date: '7- 8-©5_ <br />Portable Crushing Plant #3 <br />SPCC Plan <br /> <br />Page ii <br />August 24, 2005
The URL can be used to link to this page
Your browser does not support the video tag.