Laserfiche WebLink
MANAGEMENT APPROVAL AND REVIEW <br />In accordance with 40 CFR 112.5(b), a review and evaluation of this SPCC Plan is required at <br />least once every five years. <br />If required, as a result of the five-year review and evaluation, A & S Construction Co. will amend <br />the SPCC Plan within six months of the review to include more effective prevention and control <br />technology if: (1) such technology will significantly reduce the likelihood of a spill event from the <br />facility; and (2) if such technology has been field-proven at the time of review. A Professional <br />Engineer shall certify any technical amendment to the SPCC Plan. <br />"I have completed review and evaluation of the SPCC Plan for Crusher #3 and will/will not <br />amend the Plan as a result:" <br />Review Date Signature Amendment Type PE Certified? (Y/N, <br />(None, Admin, Date) <br />Technical) <br />MANAGEMENT APPROVAL <br />A & S Construction Co. is committed to the prevention of discharges of oil to navigable waters <br />and the environment, and will maintain the highest standards for spill prevention control and <br />countermeasures through regular review, updating, and implementation of this Spill Prevention <br />Control and Countermeasure Plan for Crusher #3. <br />Authorizec <br />Signature: <br />Date: '7- 8-©5_ <br />Portable Crushing Plant #3 <br />SPCC Plan <br /> <br />Page ii <br />August 24, 2005