My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-13_GENERAL DOCUMENTS - M1984101 (7)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1984101
>
2009-01-13_GENERAL DOCUMENTS - M1984101 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:52 PM
Creation date
3/11/2009 9:10:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984101
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
1/13/2009
Doc Name
Referral Response- Add. A
From
Park County
To
DRMS
Permit Index Doc Type
Gen. Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br />Task q : 007 State : Colorado <br />Date : 0211912003 County : Park <br />User: JD1 Site: Chaparral Meadows Pit <br />Permit/job 11: M-1984-101 <br />Abbreviation : none <br />Filename : M101-007 <br />Permit or other job action : Final Reclamation <br />Task description : Mob/demob equipment <br />EQUIPMENT TRANSPORT RIG COST Shift basis : I per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 1007) <br />Available rig capacities : 0-25 Tons 2650 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $24.34 $26.99 $33.09 <br />Operating cost/hour : $26.49 $30.27 $34.34 <br />Operator cost/hour : $27.07 $27.07 $27.07 <br />Helper cost/hour : $0.00 $23.78 $23.78 <br />Total Unit Cost/hour: $79.90 $108.11 $11828 <br />Machine <br />Description Weightlunit <br />(tons) Ownership <br />CosUhr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haut Trip <br />Cost/hrHkaat Return Trip <br />Cost/hr/tleet DOT permit <br />Ccst%et <br />-Cat D8R Series 11- 8U 53.17 $50.76 $118.28 1 $169.04 $118.28 $0.00 <br />-Cat 637G 57.38 $75.69 $118.28 1 $193.97 $118.28 $0.00 <br />-Seeding equipment 10.00 $20.00 $79.90 1 $99.90 $79.90 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $462.91 $316.46 $0.00 <br />ROADABLE EQUIPMENT <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Fairplay <br />Transportation Cycle Time : Non- I Total one-way travel distance : 20.0 miles <br />Roadable Roadable Average travel speed : 50.0 mph <br />Equipment Equipment <br />Haul time (hours) = 0.40 0.40 <br />Return time (hours) = 0.40 0.40 <br />Loading time (hours) = 1.50 NA <br />Unloading time (hours) = 1.50 NA <br />Subtotals = 3.80 0.80 <br />Total non-roadable mob/demob cost ' : $3.400.95 <br />'two round trips With haul rig <br />Total roadable mob/demob cost $0.00 <br />"one round trip. no haul rig <br />r <br />JOB TIME AND COST Total job time: 7.60 hours <br />Total job cost : $3,401 <br />t
The URL can be used to link to this page
Your browser does not support the video tag.