My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-06_REVISION - M1987049
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987049
>
2009-03-06_REVISION - M1987049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:05:59 PM
Creation date
3/10/2009 12:41:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
REVISION
Doc Date
3/6/2009
Doc Name
Amendment Submittal
From
Brierley Associates LLC
To
DRMS
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
conditions and anticipated average production, plus allowances for post-mining slurry <br />construction. <br />The proposed expanded mining operation will consist of conventional dry mining of <br />surficial sand and gravel, using the existing plant processing, freshwater and <br />sedimentation pond areas to the north. Incidental placer gold will continue to be <br />extracted at the plant as an incidental mining by product. <br />Mining will include the following elements performed generally in the order listed. <br />Some activities (e.g., initial stripping and mining) will occur concurrently at times: <br />• Fencing improvements and new fence construction; <br />• Installation of three new ground water monitoring wells along Brighton Road to <br />measure ground water levels at the site perimeter in the upgradient direction. <br />• Topsoil and overburden stripping and stockpiling; <br />• Visual barrier berm construction along Brighton Road <br />• McCann Ditch relocation <br />• Field conveyor and temporary roadway layout and setup/construction; <br />• Initial mining and perimeter dewatering trench excavation: <br />• Excavation/transfer of pit-run material to field hoppers <br />• Conveying and processing (processing at existing Bromley Lakes Pit plant) <br />• Reclamation grading and planting. <br />• Slurry wall construction. <br />Initial work will consist of improvements such as perimeter fencing and monitoring <br />well installation along Brighton Road. New fencing will tie into existing fencing and <br />consist of normal industrial security chain link fencing (2-in. mesh with 9-guage wire), or <br />equivalent, with three strand barb wire at the top to restrict public access and create a safe <br />work site. Monitoring wells will consist of nominal 2-in. PVC slotted standpipe <br />observations wells to supplement existing monitoring wells as described further in <br />Exhibit G - Water Information, below. <br />Next, topsoil and overburden stripping and stockpiling, Phase 12 mining, and <br />dewatering trench excavation will occur. Some topsoil berms will be concentrated along <br />the 50 ft geotechnical set back along Brighton Road along the east edge of the southern <br />boundary adjacent to the road to mitigate the visual impacts of mining. Concurrently, <br />24
The URL can be used to link to this page
Your browser does not support the video tag.