Laserfiche WebLink
T-?, T?30, T-31, T-32, and T?33; and also provided a Livestock mater Tank <br />approval letter from the D1vilan ofater leource? Item ?esolr?ed. <br />5. The Division Hated that in Appendix 13-? "Permanent stock Pond Evaluation" of <br />the approved permit, SAC tote that "mater sampling conducted wring the band <br />release period will be used to canfir?n [the assumption that water quality i11 be <br />suitable for the intended used". The Di?rision recommended that samples be <br />obtained, analyzed, and suitability demonstrations be submitted for Division <br />review and acceptance a soon as this field season, to ensure that derr?onstrations <br />are ?inali?ed prior to Phase III application submittal, <br />In their response, noted that they were aware that stoop pond mater quality <br />demonstrations would need to be made prior to Phase III band release. ?? <br />??soir?ed. <br />3