My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-09_REPORT - C1981014 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981014
>
2009-03-09_REPORT - C1981014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:13 PM
Creation date
3/9/2009 2:43:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Report
Doc Date
3/9/2009
Doc Name
3rd Quarter 2008 Wastebank Inspection Report
From
Energy Fields Coal, Inc
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />QUARTERLY COAL WASTE BANK INSPECTION REPORT <br />CDMR Rules 4.09.1 (11) and 4.10.2(2) <br />Mine: Southfield Mine <br />Waste Bank MSHA ID. No.: Primary Refuse Disposal Area <br />Inspection Period: Third Quarter 2008 <br />Inspection Date: October 10, 2008 <br />General Description or Reference to Site Plan: <br />The refuse area lies west of the main facilities area. Refuse has been placed in designed lifts <br />on a relatively fiat terrain. Upslope runoff is diverted away from the disposal area, while runoff <br />from the disturbed area is channeled to a sediment control pond. The mine is in final <br />reclamation and all areas have been sloped to final grade, covered with topsoil, and seeded <br />and mulched. <br />Drainage: (Discussion of springs. seeps, overland and channel flow, underdrain construction and/or <br />discharge, integrity of 100-year 24-hour drainage structures, and evidence of positive drainage). <br />Ali required underdrain construction has been completed. <br />Observation of Fill Construction: (Description of material, compaction, lift thicknesses, slopes, <br />and construction methods). <br />No refuse placement has occurred since December of 2000. Prior to cessation of mining, waste <br />material was placed in alternating lifts of fine and coarse material in accordance with the plan as <br />described in the TerraMatrix report dated December 5, 1996. <br />Activity During Inspection:
The URL can be used to link to this page
Your browser does not support the video tag.