Laserfiche WebLink
t <br />s <br />Pond No.: <br />EMERGENCY SPILLWAY Date: 10/10/2008 <br />1). Does it appear that the emergency spillway has discharged water since the last inspection? Yes No <br />2). Is erosion occurring at any section of the emergency spillway? <br />Yes No <br />Describe extent <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes No y <br />Explain: <br />OTHER OBSERVATIONS <br />po-'ra 15 dc^ I <br />'a-V 1 0/0-0 CIP-1 <br />a vl 5 Q? <br />? <br />??S .??? rte--;mss <br />/ d1 <br />MSHA Certified Pond mpound ent inspector <br />Date T' <br />Page 2 of 2