Laserfiche WebLink
<br /> <br />QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.6(17) <br />Mine: Southfield <br />NPDES ID. No.: Pond #5 <br />inspection Period: Thins Quarter 2008 <br />Inspection Date: October 10, 2008 <br />General Description or Reference to Site Plan: <br />This sediment control pond lies north east of the main facilities area. All drainage from the <br />reclaimed mine facilities area is directed to this pond. The primary discharge gate has been disabled <br />in the open position, ensuring that the pond functions as a "pass-through" facility. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />At the principal spillway inlet? <br />cellent Moderate Few Poor <br />Extensive Some Few None <br />Yes No C- <br />Yes No tl- <br />4). Erosion of the downstream toe of the embankment? Yes No _z1- <br />Cause of erosion can be attributed to: <br />5). is seepage occurring through the dam? <br />Could this seepage cause potential instability? <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />Yes No t,/ <br />Yes L-- <br />Yes i-- <br />Yes; <br />No <br />No <br />No <br />Yes No <br />None <br />Just starting <br />Page 1 of 2