My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-09_HYDROLOGY - C1981014 (3)
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981014
>
2009-03-09_HYDROLOGY - C1981014 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:13 PM
Creation date
3/9/2009 2:42:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Hydrology
Doc Date
3/9/2009
Doc Name
3rd Quarter 2008 Quarterly Sedimentation Pond Inspection Report
From
Energy Fields Coal, Inc
To
DRMS
Permit Index Doc Type
Sediment Pond Inspect
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.6(17) <br />Mine: Southfield <br />NPDES ID. No.: Pond #4 <br />Inspection Period: Third Quarter 2008 <br />Inspection Date: October 10, 2008 <br />General Description or Reference to Site Plan: <br />This pond is located on the north east comer of the refuse disposal area. It is a sediment control <br />facility receiving run-off from the refuse disposal area. The primary discharge gate has been disabled <br />in the open position, ensuring that the pond functions as a "pass-through" facility. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. <br />2). Erosion forming Gullies: <br />3). is wave action causing erosion: <br />On the Upstream embankment? <br />At the principal spillway inlet? <br />Excellen Moderate Few Poor <br />Extensive Some 9 None <br />AM <br />Yes No <br />Yes No L <br />4). Erosion of the downstream toe of the embankment? Yes No [l- <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes No_LI-1 <br />Gould this seepage cause potential instability? <br />PRINCIPAL SPILLWAY <br />1). is theerincipal spiftWay system in working order? <br />2). is the inlet free of debris and restrictive material? <br />3). is the discharge outlet free of restrictive material? <br />4). Is e,pion occurring at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />Page 1 of 2 <br />Yes r/ <br />Yes y <br />Yes v' <br />Yes <br />Just starting None <br />No <br />No <br />No <br />No l/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.