My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-09_INSPECTION - M1977170
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977170
>
2009-03-09_INSPECTION - M1977170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:13 PM
Creation date
3/9/2009 1:17:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977170
IBM Index Class Name
INSPECTION
Doc Date
3/9/2009
Doc Name
Inspection report
From
DRMS
To
Butala Construction Company
Inspection Date
2/5/2009
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
waF..cCOLORADO DIVISION OF RECLAMATION, MINING & SAFETY <br />yi 0 MINERALS PROGRAM INSPECTION REPORT <br />PHONE: (303) 866-3567 <br />* 1876 ` <br />The Division of Mining, Reclamation and Safety has conducted an inspection of the mining operation noted below. This <br />report documents observations concerning compliance of the mining operation with the permit and the regulations of the <br />Mined Land Reclamation Board. The report notes 1) Areas of successful compliance; 2) Problems and suggested <br />corrective actions and/or 3) Possible violations to be considered for possible enforcement action by the Mined Land <br />Reclamation Board. OPERATORS SHOULD READ THIS REPORT CAREFULLY BECAUSE IT MAY REQUIRE <br />CORRECTIVE ACTION AND/OR RESPONSES TO THE DIVISION IN ORDER TO AVOID CONSIDERATION OF <br />POSSIBLE ENFORCEMENT ACTION BY THE MINED LAND RECLAMATION iftecFiva) <br />MINE NAME: Butala Gravel Pit OPERATOR: Butala Construction Company MAR 0 9 ZOOg <br />COUNTY: Chaffee MIN TYPE OF OPERATION: Surface, 112c <br />INSPECTOR(S): Peter Hays _ 3 d Division otKa ion, <br />/ Mining 2 Safety <br />MINE ID # OR PROSPECTING ID #: M-1977-170 <br />INSPECTION DATE: 02/05/09 DATE OF COMPLAINT: NA <br />INSPECTOR'S INITIALS: PSH TIME OF DAY (MILITARY): 1130 <br />INSPECTION TYPE CODE(): MI POST INSP. CONTACTS(2): NO <br />JOINT INSP. AGENCY CODE (2): NO REASON FOR INSP. CODE (3): IE <br />WEATHER CODE(')- CL BOND CALCULATION TYPE('): BC <br />OP. REP. PRESENT: Mr. Jim Pizzino; Butala Constuction Compan <br />1. INSPECTION TYPE CODE - [CL-IN: IL=Illegal Operation, MI=Monitoring, MP=Mineral Prospect, SI=Surety-related, PR=Pre-operation] <br />2. POST INSPECTION CONTACTS AND JOINT INSPECTION AGENCY CODE - [CL-AG: NO=None, BL--BLM, CH=Colo. Dept. Health; CL=Land Board, <br />CT=Citizen; CW=Wildlife, FS=Forest Service, HW=Hwy. Dept., LG=Local Government, SE=State Engr.] <br />3. REASON FOR INSPECTION CODE - [CL-RS: AG=Other Agency Request, CT=Citizen Complaint, IE=Normal I&E Program, HP=High Priority, PY=Priority] <br />4. WEATHER CODE - [CL-WE: CL--Cloudy, CR=Clear, IN=Inclement - prevented inspection, RN=Raining, SN=Snowing, WD=Windy] <br />5. BOND CALCULATION TYPE: - [BC=Complete Bond, BP=Partial Bond, NN=None] <br />This list identifies the environmental and permit parameters inspected and gives a categorical evaluation of each. IF PB <br />OR PV IS INDICATED, YOU SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE <br />COMPLIANCE WITH THE TERMS OF YOUR PERMIT AND APPLICABLE RULES AND REGULATIONS. If PV <br />is indicated, you will be notified under separate cover when the Mined Land reclamation Board will consider possible <br />enforcement action. <br />GENERAL INSPECTION TOPICS <br />(AR) RECORDS ............................................. Y (FN) FINANCIAL WARRANTY ........ Y (RD) ROADS......................... Y <br />(HB) HYDROLOGIC BALANCE ................ Y (BG) BACKFILL & GRADING.......... Y (EX) EXPLOSIVES.............. NA <br />(PW) PROCESSING WASTE/TAILING..... NA (SF) PROCESSING FACILITIES....... Y (TS) TOPSOIL ...................... Y <br />(MP) GENL MINE PLAN COMPLIANCE. Y (FW) FISH & WILDLIFE ................... NA (RV) REVEGETATION ..... NA <br />(SM) SIGNS AND MARKERS ...................... . Y (SP) STORM WATER MGT PLAN ... Y (SB) COMPLETE INSP....... Y <br />(ES) OVERBURDEN/DEV. WASTE ............ . Y (SC) EROSION/SEDIMENTATION.. Y (RS) RECL PLAN/COMP.. Y <br />(AT) ACID OR TOXIC MATERIALS......... NA (OD) OFF-SITE DAMAGE ................... Y (ST) STIPULATIONS.......... Y <br />Y = Inspected and Found in Compliance PV = Inspected and Possible Violations Noted PB = Inspected and Problems Noted <br />N = Not Inspected NA = Not Applicable
The URL can be used to link to this page
Your browser does not support the video tag.