My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-09_REPORT - C1981022
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981022
>
2009-03-09_REPORT - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:13 PM
Creation date
3/9/2009 1:13:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REPORT
Doc Date
3/9/2009
Doc Name
2007 AHR Review Letter
From
DRMS
To
Oxbow Mining, LLC
Annual Report Year
2007
Permit Index Doc Type
Hydrology Report
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hydrologic Monitoring Schedule <br />Wells B-6 and EC-7 appear in the hydrologic monitoring schedule on page 5 of the 2007 ABR but do <br />not need to be sampled since they do not appear on page 2.04-41 of the permit application. In order to <br />avoid any confusion, please delete these two stations from the AHR monitoring schedule or revise the <br />schedule to show that these two stations do not need to be sampled. <br />6. Note 2 on page 5 of the 2007 AHR states that sites NF-1 and NF-3 are to be sampled similar to the <br />sampling described in note 1, plus continuous monthly field parameters. However, page 2 of Exhibit <br />2.05-E7 states that sampling of sites NF-1 and NF-3 include 0 quarter water samples. The 2007 AHR <br />does not contain full laboratory analyses for sites NF-1 and NF-3 for the fourth quarter. Please revise <br />note 2 on page 5 of the 2007 and future AHRs to include fourth quarter full suite analyses for NF-1 and <br />NF-3 and explain the absence of the fourth quarter full suite monitoring results for these two sites. <br />7. Note 8 on page 5 of the 2007 AHR states that only surface flow is to be measured at stations B-2 and 13- <br />3. The surface flow information for these two stations is presented on page 7 of the 2007 AHR. <br />However, as stated on permit application page 2 of Exhibit 2.05-E7, these two stations are to be sampled <br />for flow and field parameters twice during June after tributary flow has ended. Please explain why field <br />parameters were not sampled and revise note 8 in the 2007 and future AHRs appropriately in order to <br />avoid any confusion. <br />8. As stated on permit application page 1 of Exhibit 2.05-E7 and on page 13 of the 2007 AHR, well B2D2 <br />is a ground water monitoring site. However, well B2D2 does not appear in the hydrologic monitoring <br />schedule on page 5 of the 2007 AHR. Please revise page 5 to include well 132132. <br />Hydrologic Data Sheets <br />The hydrologic monitoring parameters list, on page 2.04-41 of the permit application and, also, on page <br />4 of the 2007 AHR, shows that dissolved iron and total recoverable iron are to be sampled when <br />laboratory analyses of surface water and ground water are performed. However, the 2007 AHR data <br />sheets for surface water monitoring sites only list one iron parameter. Please revise the hydrologic data <br />sheets for the surface water monitoring sites to show both dissolved and total recoverable iron values, as <br />was done with the ground water monitoring sites. <br />10. The hydrologic monitoring parameters list, on page 2.04-41 of the permit application and on page 4 of <br />the 2007 AHR, shows that alkalinity is to be tested whenever laboratory analyses of surface and ground <br />water are performed. However, none of the 2007 AHR data sheets appear to show alkalinity testing <br />results. Please explain. <br />11. On page 1 of 6 of the 2007 AHR data sheets for surface water monitoring site S-1, there are no entries <br />for flow from June 2007 through October 2007. In order to avoid any confusion, please revise the data <br />sheet to show zeros for those months when there were no flows. <br />12. The note on permit application page 2.04-41 states that several chemical parameters in addition to ones <br />on the standard list are to be tested at the North Fork surface water sampling sites during August. <br />However, the data sheets for NF-1 and NF-3 in the 2007 AHR do not show the results for some of these <br />additional constituents, including ammonia, cyanide, silver, boron, chromium III, chromium :[V, <br />chlorine and nickel. Please explain. <br />2
The URL can be used to link to this page
Your browser does not support the video tag.