Laserfiche WebLink
Worst case reclamation costs for this scenario are shown in Table D-3: <br />Table D-3 Reclamation Task and Cost Estimate <br />Activity Description Time Months Cost $ <br />Place overburden on the sideslopes to reduce the slope to 31-1:1V using <br />a dozer on a downhill push, 4,000 c @ $0.33 c <br />0.3 <br />$1,320 <br />Bring Topsoil from stockpile, place topsoil on sideslopes 2.05 acres x <br />12" depth, spread and final grade @ $1.00 c <br />0.1 <br />$3,307 <br />Disc topsoil areas prior to seeding @ $200 per acre x 2.05 acres 0.1 $615 <br />Seed and mulch rangeland disturbed areas. Seeding and mulching will <br />be employed at $850/acre x 2.05 acres <br />0.1 <br />$1,743 <br />Totals 0.6 $6,985 <br />DRMS Costs 21% x direct costs $1,467 <br />Total Bond Amount $8,452 <br />Mott pit, March 2009 D-6