4. Reclamation Timetable <br />The timetable for reclamation is shown below in Table D-1. Reclamation Timetable <br />Table D-1 Reclamation Timetable <br />Year Phase Comments Length of time to <br /> complete months <br />2009 Site Preparation, Topsoil stripping, install the 2 <br /> 1 northern portion of Isolation Berm 1. <br />2009- Mine in Mining Area 1, stockpile topsoil and <br />2012 overburden, place excess overburden on pit floor, 47.0 <br /> 2 seed topsoil and overburden stockpile. <br />2012- Mine in Mining Area 2, stockpile topsoil, place <br />2013 excess overburden on pit floor, seed topsoil and 14.9 <br /> 3 overburden stockpile. Install Isolation Berm 2 <br />2013- Mine in Mining Area 3, stockpile topsoil, seed <br /> topsoil stockpile. Place overburden encountered in 21.8 <br />2015 4 Mining Area 3 on the sideslopes of Mining Area 2 <br />2015- Mine in Mining Area 4, stockpile topsoil, seed <br />2016 topsoil stockpile. Place overburden encountered in 18.3 <br /> 5 Mining Area 4 on the sideslopes of Mining Area 3 <br /> Place stockpiled overburden on the sideslopes of <br /> <br />2017 Mining Area 4. Place topsoil on all sideslopes. <br />4 <br /> Seed the sideslopes. Remove the product <br /> 6 stockpiles and scale. <br /> Total 108 <br />Mott pit, March 2009 D-2