My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-04_PERMIT FILE - M2008082 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008082
>
2009-03-04_PERMIT FILE - M2008082 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:06 PM
Creation date
3/5/2009 1:45:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008082
IBM Index Class Name
PERMIT FILE
Doc Date
3/4/2009
Doc Name
Adequacy Response
From
Hart Environmental
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine ( Total Fleet Size Haul Trip Return Trip <br />Description Cost/hour/unit (No. units) Cost/hr/fleet Cost/hr/fleet <br />-Fuel Tanker, 6x4, 210 HP $67.11 1 $67.11 $67.11 <br />-Lute Truck, 6x4, 210 HP $82.39 1 $82.39 $82.39 <br />-Light Duty Pickup, 04, 314 T. $48.05 1 $48.05 $48.05 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Subtotals :1 $197.54 1 $197.54 <br />Nearest major city or town within project area region : Denver <br />Transportation Cycle Time : Non- Total one-way travel distance : 30.0 miles <br />Roadable Roadable Average travel speed : 45.0 mph <br />Equipment Equipment <br />Haul time (hours) = 0.67 0.67 Total non-roadable mob/demob cost' : $14,829.09 <br />Return time (hours) = 0.67 0.67 • two round trips with haul rig <br />Loading time (hours) = 2.00 NA Total roadable mob/demob cost " : $263.39 <br />Unloading time (hours) = 2.00 NA •• one round trip, no haul rig <br />Subtotals = 5.33 I 1.33 <br />JOB TIME AND COST Total job time : 10.67 hours <br /> Tot al job cost : $15,092
The URL can be used to link to this page
Your browser does not support the video tag.